2BV Water Ring Vacuum Pump Installation and Maintenance Guide
2025-05-09
There are three points that need to be paid attention to in the installation stage of 2BV water ring vacuum pump: 1) the foundation should be flat and cushioned with shock-absorbing rubber to avoid resonance; 2) The diameter of the inlet pipe shall not be less than the diameter of the pump body, and